Interstate 670 (Ohio)

Interstate 670
Route information
Maintained by ODOT
Length: 10.43 mi[1] (16.79 km)
Existed: 1975 (by FHWA), 1976 (by ODOT), completed 2003 – present
Major junctions
West end: I-70 in Columbus
  I-71 / SR 315 in Columbus
East end: I-270 / US 62 near Gahanna
Highway system

Auxiliary route of the Interstate Highway System
Main • Auxiliary • Business

Ohio highways
Interstates • U.S. Routes • State Routes

SR 669 SR 671

Interstate 670 (I-670) is an Interstate Highway in the U.S. state of Ohio that passes through downtown Columbus, connecting I-70 west of downtown with I-270 and US 62 near the eastern suburb of Gahanna. I-670 provides access to Port Columbus International Airport, and intersects SR 315 and I-71 downtown. The section between SR 315 and I-71 is commonly referred to by locals as the "North Innerbelt", with the rest of the innerbelt consisting of SR 315 (west), I-70 (south), and I-71 (east and south).

Contents

History

In the late 1970s, the Ohio Department of Transportation was unable to complete the Spring-Sandusky interchange, linking both sections of the highway, due to budget shortfalls and environmental regulations, leaving I-670 the only uncompleted Interstate in Ohio. Two decades passed before work began on the last remaining section, bridging the gap between the two completed sections. Work on this section also included the High Street cap, a cut-and-cover bridge over the highway featuring shops and restaurants. I-670 was finally completed in 2003.

Route description

West of I-71, I-670 passes around both sides of Fort Hayes with two two-way roadways. The south roadway carries the eastbound main lanes and the westbound entrance ramps from I-71 north and SR 3 (Cleveland Avenue), while the north roadway carries the westbound main lanes and the eastbound entrance from US 23 north (4th Street) and High Street.

Exit list

The entire route is in Franklin County.

Location Mile[1] # Destinations Notes
Columbus 0.00 I-70 west – Dayton, Indianapolis Westbound exit and eastbound entrance. No guide signage exists to inform WB traffic what freeway they are on for several miles beyond the end of I-670.
0.46 1A US 33 west Westbound exit and eastbound entrance
0.95 1B Grandview Avenue Signed as exit 1 eastbound
2.24 2A US 33 (Dublin Rd) / SR 315 south Eastbound exit and westbound entrance; connection to 315 ramps via traffic signals and (for NB-WB traffic) a short stretch of 33
2.42 2A SR 315 south Westbound exit and eastbound entrance
2.43 2B SR 315 north
3.14 3 Goodale Street, Neil Avenue
3.52-
3.95
4 US 23 (Fourth Street, Third Street) / High Street Signed as exits 4A (south) and 4B (north) eastbound and 4A (north) and 4B (south) westbound
4.33 4C SR 3 (Cleveland Avenue) / Leonard Avenue Westbound exit is part of exit 5
4.58-
4.76
5 I-71 – Cleveland Exit to downtown (via Lester Dr / Spring St) accessed from westbound only.
6.44 6 Leonard Avenue
7.56 7 US 62 west (5th Avenue) West end of US 62 overlap
8.50-
9.06
9 Johnstown Road, Cassady Avenue, Stelzer Road - Port Columbus International Airport
10.43 I-270 – Cleveland, Wheeling
10.43 US 62 east – Gahanna Continuation beyond I-270

References